Ar. Jovit BingcangContractor Starter System
BETA For starting residential contractors · 0–3 years

Hindi lang estimate.

quotation na kaya mong i-present at ipagtanggol.

Four systems in one Excel file: get projects, price, manage and collect. Measure from your plans, get a checked BOQ that does not lose money, and know your walk-away price before you sit with the client.

Works in Excel or Google Sheets No macros, no scripts 7-day "It works" guarantee
Founding beta
First 5 testers, until Tue, Dec 15, 2026, whichever comes first
client copy ↓

BILL OF QUANTITIES

Sample 2-storey residence (FICTIONAL)
Summary by tradeAmount
01General Requirements141,600.00
03Concrete Works285,602.28
06Masonry574,027.02
… 10 more trades
Subtotal (all items)₱ 2,593,346.40
Contingency 10%₱ 259,334.64
GRAND TOTAL₱ 2,852,681.05
Prepared by (contractor)
signature / date
Conforme (client)
signature / date
CONTRACTOR'S LOGO
ProjectSample residence
ClientSample Client
Prepared by · Date · Rev—
SheetBOQ-01
SAMPLE — FICTIONAL DATA
walk-away price? never on the client copy.
4systems in one file
13trades in the internal BOQ
233math checks that pass
10Taglish message scripts
A-01

You already have projects. Your system is still messy.

  • 01
    You guess your prices.So the quotation comes out incomplete, or underpriced, and you find out halfway through the project.
  • 02
    You look unsure in front of the client.When they ask for a discount, you don't know how low you can go without losing money.
  • 03
    "Akala ko kasama 'yan."No clear scope, so the client expects items you never priced.
  • 04
    Leads, schedule and money live in your head.Follow-ups slip, the crew waits for materials, and you only know your profit at the end.
Every project, the same guessing. Hula-hula sa presyo, walang sistema.
there's a simpler way ↓
A-02

One file. Four systems. One way of working.

A master copy for your leads, then one copy per won project. Everything you type once flows to the BOQ, the client printout, the scope, the schedule and the money tracker.

FROM

Hula-hula pricing and no system on every project

TO

A simple construction business system: quote, manage and collect

01

Get projects

never forget a follow-up

Lead tracker with FOLLOW UP TODAY / OVERDUE flags, win rate, where clients come from, plus 10 ready Taglish replies.

THE CORE 02

Price

measure · price · present

Quantities from your plans, a checked BOQ, your walk-away price, a client printout and a scope of works.

03

Manage

the crew never waits

Weekly schedule bars, a daily site log, and materials requests that say ORDER NOW or LATE.

04

Money

are you still making money?

Billing 30/30/30/10, collections, change orders, expenses and budget vs actual per trade.

A-03

From plans to a signed quotation.

System 02 is the heart of the file. Three steps, each with a check, so you know the numbers are right before the client sees them.

STEP 01

Measure

Type each concrete element and CHB wall from your plans. The helpers compute cement, sand, gravel, CHB, mortar, plaster and core fill with approved factors plus 5% wastage, and fill the BOQ.

CHECK"FACTOR NOT SET" or "CHECK OPENINGS" tells you exactly what to fix.
STEP 02

Price

Type your supplier prices (Bulacan reference prices are used until you do, flagged REF PRICE). Allowances, overhead, profit and contingency are built in. You get cost per sqm and your walk-away price.

CHECKStatus says COMPLETE only when no item has NO PRICE, NO QTY or ZERO TOTAL.
STEP 03

Present

Print the client BOQ and the Scope of Works. Walk the client through the scope first, then the price. The Presenting Guide gives Taglish replies to objections.

RESULTA signed BOQ summary and a signed scope. Wala nang "akala ko kasama 'yan."

Try the concrete helper.

same factors as the real file →

Type one element. Volume = L × W × T × count. Cement bags = volume × class factor × 1.05, rounded up. Sand and gravel = volume × factor × 1.05.

This is the same logic as the Free Trial file, which you can use on your own project.

you type herecomputes by itself
01 HELPERS · CONCRETE demo
Volume—
Cement—
Sand—
Gravel—
OKExample: 6 beams, 4.00 × 0.25 × 0.40 m, Class A.
A-04

What's inside the workbook.

One workbook. 00 Home opens first and links to every tab. Tab colors follow the system, just like below. Click a tab.

START
00 Home

Yellow cells = you type. Grey cells = computed and locked. Red bold caps = must fix.Formula cells are locked without a password.

The client copy

What you print and have signed.

  • Summary by trade, contingency, grand total PRINTS
  • Only the items used, at client prices PRINTS
  • Title block and a box for your own logo PRINTS
  • Scope: Included / Excluded / By Owner PRINTS

The internal copy

What only you see.

  • Your costs, allowances, overhead and profit INTERNAL
  • Cost per sqm INTERNAL
  • Walk-away price (grand total without profit) INTERNAL
  • Maximum discount before losing money INTERNAL
A-05

Where the toolkit stands today.

This is a beta. It is built and math-checked. You would be one of the first 5 contractors to use it on a real project.

There are no customer reviews yet, so I won't show any. What you get instead: a free preview, a free trial on your own project, a guarantee, and every future update free.

BlueprintAPPROVED
20 Nov 2026
Files builtYES
Toolkit (4 systems), sample, free preview, free trial
Math checked233 CHECKS PASS
BOQ 123 · money 51 · manage 33 · leads 26, plus 18 trial checks
Tested in Excel & Google SheetsIN PROGRESS
Tested by real contractorsTHAT'S THE BETA
A-06

Is this for you?

Yes, if you…

  • are a residential contractor starting out, around 0–3 years
  • already have projects, but your system is still messy
  • want quotations you can explain and defend
  • use Excel or Google Sheets, or are willing to
  • want to know your profit during the project, not after

Not for you, if you…

  • want someone to prepare the BOQ for you (this is a ready-to-use file, not a service)
  • expect the file to bring you clients (it gives tools and scripts, not a promise of clients)
  • need legal or tax advice (the file gives the fields; you set your own terms)
  • need formwork and rebar helpers today (planned only if beta buyers ask)
Ar. Jovit Bingcang
Prepared byAr. Jovit Bingcang
A-07
Made by a real builder, not a template

Built like my drawing sheets.

— Ar. Jovit Bingcang

I'm an architect, and this is my own product, sold by me personally. Every client printout in this file has a title block like the ones on my drawing sheets: project, client, prepared by, date, revision, sheet number, and a box for your own logo.

The quantity factors are mine, and the reference prices are from Bulacan suppliers (Aug–Nov 2026). Until you type your own prices, the file flags every reference price so you never send one by accident.

I'm selling a ready-to-use product only, so my time goes into making the file better with your feedback.

A-08

Founding beta price.

One-time payment. For the first 5 beta testers, until Tuesday, Dec 15, 2026, whichever comes first.

What you get

  1. Get Projects. Lead tracker with follow-up reminders, and 10 Taglish message scripts.
  2. Price Projects. BOQ estimate with automatic checks, quantity helpers with my factors, Bulacan reference prices, client BOQ print and scope of works.
  3. Present and defend. Presenting Guide and walk-away price, so you know how low you can go.
  4. Manage + Money. Schedule, site log, materials requests and a money tracker (billing, expenses, real profit).
  5. Free updates. Every future update free for beta buyers: new helpers and improvements from your feedback.
Founding beta · one-time
₱1,499 Regular price after beta:
₱1,999–2,499
AccessOne .xlsx file for Excel or Google Sheets, sent by email after your payment is confirmed
PaymentInstaPay QR: scan with GCash, Maya or your bank app. You send your reference number, I check it and send your file.
Guarantee7-day "It works" guarantee (below)
DeadlineOrders close after 5 spots or 11:59 PM, Dec 15, 2026 (PH time). No fake countdowns.

Not sure yet? Get the free preview and trial first.

"IT WORKS"
GUARANTEE
7 DAYS

If the file doesn't work, I fix it or refund your ₱1,499.

Within 7 days of purchase, message me the tab name and a screenshot of the problem. If the file will not open, shows errors, or computes wrong in your Excel or Google Sheets, I fix it or refund you. The guarantee covers the file, not a change of mind, which is why the free preview and trial come first.

Free · no payment

See it and try it before you buy.

Free Preview

An 11-page PDF of a fictional 2-storey house: cover, Start Here, the client BOQ, the scope, the internal numbers page and the first page of the Presenting Guide.

Free Trial

A separate file with Concrete Works only: the concrete helper, my concrete factors and three reference prices. Use it on your own project.

SEND ME THE PREVIEW + TRIALLEAD-01
A-09

Questions before you buy.

ask me anything else after
Does it work in Google Sheets, or only Excel?

Both. It uses plain formulas only, no macros and no scripts. In Google Sheets, print with "Selected cells". Testing in both apps is part of this beta, and the "It works" guarantee covers it.

Do I have to use the Bulacan reference prices?

No. Your price always wins. Reference prices are only used until you type your own, and every one is flagged REF PRICE. Prices older than 6 months are flagged OLD PRICE.

Will my client see my profit or walk-away price?

No. The client BOQ shows the summary by trade, contingency, grand total and the items at client prices. Allowances, overhead, profit and the walk-away price stay on the internal sheets.

What if the client asks for a discount?

The Presenting Guide shows you how: lower the price by changing the scope, never below your walk-away price. Each change updates the BOQ and scope automatically and you reprint. Below the walk-away price, you politely decline.

How do I pay and get the file?

Click "Reserve my beta spot", enter your name and email, then pay ₱1,499 by scanning the InstaPay QR with GCash, Maya or your bank app. Send your reference number on the same screen. Once I confirm the payment, the file is emailed to you.

Will you review my BOQ for me?

Not in this offer. This is a ready-to-use product only. You can share your finished file with me as beta feedback, but it is not a review service.

What happens after the beta?

The regular price will be ₱1,999–2,499, decided with beta feedback. Beta buyers keep getting every update free.

Your next quotation, priced right.

and you know exactly how low you can go.
Free preview first

First 5 beta testers or until Tue, Dec 15, 2026 · 7-day "It works" guarantee · Free updates

₱1,499Founding beta · first 5
RESERVE A BETA SPOT
Preview mode: not connected to Google Sheets yet. Nothing is saved.
1 · DETAILS2 · PAY3 · CONFIRM

Your details

Your file is emailed here once your payment is confirmed.

Pay with InstaPay QR

Scan with GCash, Maya or your bank app. Pay the exact amount (transfer fees may apply), then type the reference number from your receipt.

InstaPay QR
Amount
₱1,499
Order ID
—
Pay to
—
PAYMENT
SUBMITTED

Salamat! Your reference is in.

I'll check that the payment arrived in my account. Once it's confirmed, your file is emailed to . This is checked by hand, so it can take a few hours.

Your order ID: . Keep it with your payment receipt.

Resend my access

For paid orders only. The file is sent again to the email on your order.